Capdiamont\’s Weblog


THA Speeder Ride Season starting this Saturday and illegal dump cleaned up
Friday 21 Jun 2013, 03:45
Filed under: Humboldt, Samoa, THA | Tags: , , , , ,

First the dump cleanup. Timber Heritage Association volunteers drove hundreds of miles to to pick up and drop off the dump truck from the active part of the railroad. They also drove that railroad capable dump truck back and forth on the railroad to get the trash out of the inaccessible area between Loleta and Fernbridge. So with much help NCRA, NWP, THA, Eel River Resource Recovery, SWAP, Humboldt County, Wendt Construction, CCC, High Rock Conservation Camp, and many volunteers the area was cleaned up. Besides the dump truck, two excavator were used. One was used to load the dump truck, and the other was used load the four large disposal bins that Eel River Resource Recovery donated. We should be proud how much Eel River Resource Recovery does to help cleanup our area.

Humboldt Beacon Article on Cleanup

Speeder Crewcar rides start up this Saturday! What a great way to get a different view of Humboldt Bay and to learn a bit of our history.

20130621-064437.jpg

Advertisements
Comments Off on THA Speeder Ride Season starting this Saturday and illegal dump cleaned up


Loleta Antique Show and THA Speeder Run this Saturday 9-4ish

Looks to be another great weekend for fun, with some showers. This Saturday is the Loleta Antique Show and Loleta has been kind enough to invite Timber Heritage Association down to run once again. This show sponsored by the Loleta Volunteer Fire Department. According to their website it is one of the largest Antique Shows in Northern California. My only questions is how did I miss these gems for so long?

Comments Off on Loleta Antique Show and THA Speeder Run this Saturday 9-4ish


Railroad cleanup photos and videos
Saturday 22 Sep 2007, 10:43
Filed under: Humboldt, NCRA, Railroad, THA | Tags: , , , ,

Cleanup went well today, I figure we have cleared a total of 0.8 of a mile. Doesn’t sound like much, but lots of heavy brush, and it was fun in the speeders. I figure 0.2 of a mil to go of heavy brush before hitting the easy stretch near the main highway. The easy stretch is about 1/2 mile. Then about 1.2 miles of mixed heavy and easy areas. About 2.2 miles of railroad total we want to clear at this point. Map here.

We had 3 speeders running on the line.

Videos here

Speeder going away

On speeder, going backwards , most of the cleared right of way. Warning, very jumpy, and large file size.

Speeder coming back




%d bloggers like this: